Google Ads

Saturday, 4 April 2015

Ideal CEO before renovation

Collected the key on 1 April and went to check the unit of the unit. Below are the picture taken before the renovation take place. It is the original unit.






 view from the unit








Below are the 2 modifications done on the unit:

Modification 1:
Removed the water reservoir on the mezzanie floor


Modification 2:
Add in a control valve for the bidget


No comments:

Post a Comment